Sunday, January 31, 2010

Sites With Lift And Carry How Do They Get The Cable To The Site Of A Ski Lift?

How do they get the cable to the site of a ski lift? - sites with lift and carry

Some lifts a distance of a mile of them - which means that there are about 4 miles cable without interruption. Certainly, no truck could carry all the cables?

6 comments:

Mike said...

The cable is actually torn to pieces and refined.

It comes in rolls and is located directly on the pulleys Unraveled, hang, and when she goes out queue 1, as the spice in two roles.

Splicing is usually about 10-20 meters, if you do not really see the other because the cable Ravel.

Cflames said...

Good question! I sat on the lift for hours and never thought of! It's like, why is there a light in the fridge, but not in the freezer? Things that we never really thought about it.

Niklaus Pfirsig said...

First, a small cable networks and its use is easier to carry a heavy cable, and pull more weight on the cable until the cable is the size that you need to. This is usually done between the towers of support, rather than the entire distance.

Tubby said...

If you are very intelligent

troutsla... said...

As already mentioned, to butt the cable that instrument, picks up the black wire and filled, which allows the cable actually use the strands woven together solves this mess up the tension, the joints are selected must match the color and checked when I once a year.

glyphdoc said...

It's really cool. Who are the cables on the site. They do this as suspension bridges.

Alternatively, if the lifts can at a time when the cable was to be seen at the edges. Watch as it happens.